Windchill Upgrades
A fixed-bid upgrade to Windchill 13.1, proven on a copy of your data before production is touched.
Whether you run Windchill 12.1.2, 12.0.2, or something older, the upgrade does not get easier by waiting. Support windows close, CAD and integration versions drift out of compatibility, and the people who built your current system move on. Fishbowl has been a PTC partner since 1999, and we deliver Windchill upgrades remotely for a fixed price, following the same five milestones every time.
What is included
Fixed bid, delivered remotely
One price agreed up front, so there are no surprise invoices halfway through. The work is done remotely around your schedule.
Compatibility checked first
We validate your hardware, operating system, JDK, Creo, AutoCAD, Inventor and Creo View versions against the PTC compatibility matrix for Windchill 13.1.
Tested on a copy of your data
We run the upgrade on a copy of your production system first, so problems show up in test and not on go-live weekend.
Customizations carried forward
Existing customizations and integrations with Creo, AutoCAD, Inventor and downstream systems are reviewed, reworked where needed, and validated.
Weekend cutover with support
Production is upgraded over a weekend to limit engineering downtime, with a Fishbowl consultant available remotely through the first weeks.
Why not next year?
The cost of waiting
- Support windows close. Windchill 12.0 standard support ended June 30, 2024. Windchill 12.1.2 standard support ended December 31, 2025, and extended support ends December 31, 2026.
- The path gets longer. There is no direct upgrade from 12.0.2 to 13.1, so it takes a double jump through 13.0.2. Each release you skip can add a step.
- Creo, AutoCAD, Inventor, workgroup managers and integrations each have their own support matrix. Falling behind on Windchill means falling behind on all of them.
- The engineers who set up your current system may no longer be with you.
Where are you starting from?
- Windchill 12.1: we confirm the supported path to 13.1 and scope a single project.
- Windchill 12.0: we plan both jumps, through 13.0.2 to 13.1, as one engagement.
- Windchill 11, 10 or older: we assess whether a stepped upgrade or a data migration into a new 13.1 system carries less risk.
- Heading to Windchill+: we help you clean up and prepare your data and customizations before the move.
Five milestones, every time
1. Kickoff and planning
We confirm the team and roles, check version compatibility, and leave you with a schedule and a remote-access plan.
2. Test upgrade
We upgrade a copy of production, including any intermediate release the path requires.
3. Pilot validation
Your team tests the upgraded system, customizations included. We rework anything that does not pass, and move on only when you sign off.
4. Production upgrade and go-live
The upgrade you approved in test, run against production over a weekend, validated before Monday morning.
5. Test/dev rehost and closeout
If you want a new test or development environment, we build it from a snapshot of the upgraded production system.
Beyond the upgrade
Ask about cloud rehosting, remote system administration and managed services if you want Fishbowl involved after go-live.
Know your upgrade path in 30 minutes.
In a 30-minute briefing we review your current version, your CAD and integration footprint, and your target go-live date.